Concrete Walkways and Paths in La Mesa
A concrete walkway in La Mesa often needs no construction permit. La Mesa does not need a construction permit for platforms, decks and walks 30 inches high or less over grade. We come out and give you a free written estimate.

The 30 Inch Rule
La Mesa does not need a construction permit for platforms, decks and walks 30 inches high or less over grade. Most garden paths sit right on the ground, so they fall under that line. A raised walk or steps up a slope may not.
Forms and Layout
Forms set the width, the curve and the slope, like the boards in the photo. Walk the layout before the concrete comes. Make it wide enough for two people side by side.
The Public Sidewalk
The sidewalk along the street is public right of way. La Mesa's Engineering Counter handles work there and lists an Encroachment Permit Application.
Before Digging
State law says the person digging must notify the regional notice center at least two working days, and not more than 14 calendar days, before the dig. The notice day does not count. Call 811 to start.
Common Questions
Do I need a permit for a garden path in La Mesa?
Walks 30 inches high or less over grade do not need a La Mesa construction permit.
Who handles sidewalk work in front of my house?
Work in the public right of way goes through the La Mesa Engineering Counter.